CHALLENGES

The OEM liners used across four centrifugal pumps had historically high wear rates. With the supply chain challenges during COVID, the site was having a difficult time stocking enough parts to keep the operation running.

PROCESS

2 trial liners were installed and monitored throughout their complete life cycle to determine actual wear performance. Statistical analysis compared old vs. new liner performance, with a 10-year cost simulation to validate the business case.

  • Process Simulation
  • Statistical Analysis
  • Software Implementation

KEY METRICS

Based on the execution of the identified recommendations, the following benefits were realized:

3.5X

Increase in impeller life.

$70K

Reduction in labor and material cost per year.

ACTIONS

  • 10-year cost simulation completed to review financial impact.
  • Updated work instructions to reflect material changes.
  • Communication with relevant stakeholders on findings and updates.
  • Updated CMMS to reflect spare part stock requirements.
  • Expanded material changes to other pump applications.

OUTCOMES

Improved Impeller Life

Characteristic life increased from 1.75 to 6.2 months.

Decreased Material Consumption

The combination of a local supply chain and improved wear life reduced risk of facility downtime due to inadequate impeller stock.